![]() |
GERDAThe GERManium Detector Arrayfor the search of neutrinoless double beta decay in Ge-76 at the Laboratori Nazionali del Gran Sasso (LNGS) |
|
|
GERDA News Archive13 Feb 18: Improved Phase II limit - accepted for publication in Physical Review Letters6 April 17: Publication in Nature on 6 April 29 June 16: Presentation of first Phase II results at LNGS. 17 June 16: Successful unblinding of the first Phase II data sets. December 2015: Start of Phase II physics run with 7 strings of 35 (7) kg of enriched (natural) Ge detectors; the seven strings of semi-coaxial & BEGe detectors within their minishrouds and view from bottom on detector array & fiber assembly of the LAr veto. 3 Mar 15: Phase II commissioning: Th-228 calibration spectrum with LAr veto & pulse shape discrimination 24 Feb 14: GERDA's response to a letter in CERN Courier 16 July 13: GERDA phase I results released 11 July 13: Results from GERDA phase I will be presented in a seminar on July 16 at 14:30 at LNGS. The seminar will be streamed at this link. 9 July 13: Pulse shape discrimination for GERDA Phase I data 21 June 13: The background in the neutrino-less double beta decay experiment GERDA 14 June 13: Successful unblinding of the phase I data set 06 Mar 13: The paper ``The GERDA experiment for the search of neutrinoless double beta decay in Ge-76'' has been published in The European Physical Journal C, 73:2330 (2013) 12 Feb 13: The paper ``Measurement of the half-life of the two-neutrino double beta decay of 76Ge with the GERDA experiment'' has been published in J. Phys. G: Nucl. Part. Phys. 40 035110 (2013) 17 Dec 12: The GERDA experiment for the search of neutrinoless double beta decay in Ge-76 13 Dec 12: Measurement of the half-life of the two-neutrino double beta decay of Ge-76 with the Gerda experiment 6 Jul 12: Five enriched BEGe Ge-76 diodes deployed (pict) ; Th-228 calibration spectra 1 Nov 11: Three strings with all eight enriched Ge-76 diodes (ANG1- ANG5, RG1-RG3) and one natural Ge diode (GTF112) deployed. Th-228 calibration spectra with indicated preliminary FWHM resolutions. 21 June 11: first string with 3 enriched Ge-76 diodes deployed; GERDA Inauguration on 9 Nov 2010 at LNGS GERDA Presentation The collaboration - pics The physics program The construction Looking ahead Flyer English (pdf, 3.7 MB) Deutsch (pdf, 3.7 MB) Italiano (pdf, 3.7 MB) Video mov (140 MB) Poster 1 2 3 4 5 6 7 02 June 10: first string with 3 non-enriched Ge diodes deployed; Th-228 calibration spectra Cryostat filled 17 Dec 09 Transfer of clean bench to GERDA 29 Nov 2009 First LAr 09 Nov 09 03 Nov: Start of cryostat cooldown, photo 1 & 2 Summer 2009 Installation cryogenic infrastructure August 2009 PMT installation finished Works resumed May 05: PM rigging in water tank, lock test set up in HdM 2009 April 06 earthquake info: INGV , USGS Clean room construction started 02 Feb 09 Status Feb 4 , 9 GERDA bldg construction started 08 July 08 11.7.08: photo 1 & 2 18.7.08: photo 1 & 2 & 3 Water tank construction started 28 April 08 Status 7.5.08 & 12.6.08 Cryostat arrived 6 Mar 08 Pictures Movie |
Last modified: 04.11.2010 | go to top |