Cryogenic Infrastructure Installation
Assembly of internal cryostat piping
Internal piping & copper shroud
LAr inlet pipe
LAr trench
Pt100 at top neck position
Pt100 at liquid nitrogen inlet
PT100 at bottom neck position & swimmer
Pt100s at cryostat top & electrical connection of shroud
Assembly copper shroud
Copper shroud from bottom
Copper shroud from top
Assembly of shroud's copper & steel parts
Completed piping at cryostat
Completed piping at cryostat
Placing argon gas buffer
Placing argon gas buffer
Placing argon gas buffer
Level 6000 with PLC cabinet
Safety valve, rupture disks on top of Ar exhaust gas heater
Argon exhaust gas heater
Cryogenic valve box
PLC installation in cabinet
Insulation vacuum safety disk
Summer 2009