Construction of the H.E.S.S. telescopes
Installation of telescope dish (April 2002) Installation of telescope dish (April 2002) Installation of azimuth cable chain in 2nd telescope (April 2002) The steel structures of the four telescopes of H.E.S.S. Phase I are ready (April 2002)
Overview of the site, including the control building and the Gamsberg (April 2002) Overview of the site (April 2002) Overview of the site (April 2002) First telescope with lightning protection masts and camera hut (April 2002)
First telescope with lightning protection masts and camera hut (April 2002) Installation of the camera, inside the camera shelter (June 2002) First telescope with its camera and the camera shelter(June 2002) First telescope with its camera (June 2002)