 |
 |
 |
 |
Installation of telescope dish (April 2002) |
Installation of telescope dish (April 2002) |
Installation of azimuth cable chain in 2nd telescope (April 2002) |
The steel structures of the four telescopes of H.E.S.S. Phase I are ready (April 2002) |
 |
 |
 |
 |
Overview of the site, including the control building and the Gamsberg (April 2002) |
Overview of the site (April 2002) |
Overview of the site (April 2002) |
First telescope with lightning protection masts and camera hut (April 2002) |
 |
 |
 |
 |
First telescope with lightning protection masts and camera hut (April 2002) |
Installation of the camera, inside the camera shelter (June 2002) |
First telescope with its camera and the camera shelter(June 2002) |
First telescope with its camera (June 2002) |