 |
 |
 |
 |
Telescope structure (August/Sept 2002) |
Telescope structure and control building (August/Sept 2002) |
Telescope structure at sunset (August/Sept 2002) |
First two telescopes complete with mirrors (Dec. 2002) |
 |
 |
 |
 |
First two telescopes complete with mirrors (Dec. 2002) |
First two telescopes complete with mirrors (Dec. 2002) |
First two telescopes complete with mirrors (Dec. 2002) |
First two telescopes complete with mirrors (Dec. 2002) |
 |
 |
 |
 |
Camera 2 arrives on site (Feb. 2003) |
Transport of camera 2 to telescope (Feb. 2003) |
Installation of camera 2 (Feb. 2003) |
View of the HESS array; two telescopes are fully operational (April 2003) |